Trellis and Bench V
















Today I installed the Trellis and Bench in the Ocala Forest. The structure here is the foundation for the trellis. I will dig holes and lower it in to the ground. Than it will be leveled and concrete will get poured at each post.





The trellis is mounted to the foundation and the project is complete.








House Number II



The house number after it was installed.








It matches the Pagoda and looks great with the paint color of the house. Contact me if you want to know where to get the tiles, and I know someone who can make a nice frame for them...

Trellis and Bench IV


The bench is completely cut and assembled here.









And here it is stained and it sits in the completed Trellis. Just some more staining and this project is complete.

House Number






I had a client who bought house number tiles. Very nice, but not easy to hang on the wall. The idea was to create a frame that would hold all of them, and match the Pagoda that was installed before. (see posts on Pagoda) So I created this frame, and will hang it on the outside wall.

Trellis and Bench III

I planed some rough boards down to 5/8 and ripped them down to 1.5 inches, to make the lattice for the sides and back of the Trellis.